Remote Export Control via Cloud Tethering Technology

Project Overview
Location: Residential Property with Shed/Workshop
System Type: 2-Phase Supply with Solar PV Installation
Inverter Setup: 2 × 10kW Single Phase Inverters (Goodwe MS G3)
Export Limit: 5kW total site export
This property consists of two-phase power to the main switchboard (MSB) in the house and two-phase power to a shed/workshop sub-board, where the solar PV system is being installed. The shed is approximately 40m from the house, presenting a unique challenge for managing export limits and compliance requirements.
Challenge: Ensuring Compliance & Optimising Energy Use
With strict Victorian emergency backstop compliance and export limiting requirements, the installer needed a solution that could:
Maintain a 5kW export limit
Ensure compliance with Victoria’s emergency backstop regulations.
Enable smart energy management by dynamically controlling loads on-site.
Utilise Wi-Fi-based control for seamless system integration between the house and shed.




The increasing speed is what makes this simple runner so exciting. At the Dinosaur Game beginning, the obstacles seem easy, but after traveling a long distance, your reactions have to become much faster to survive.